Urban building with three floors, currently used for aluminum carpentry in full operation. It has all the machinery, stock and a wide portfolio of clients to be able to work from the first day.
It is distributed in:
231m2 basement-warehouse, which is accessed from the street via a ramp to unload all the merchandise. There is a forklift that reaches all floors.
First floor: which overlooks the main façade and rear façade distributed in reception, workshop and dressing rooms. From the rear, it is accessed by truck through an overhead door or a pedestrian door.
First floor: accessed by internal marble staircase and is used as a showroom, offices and toilets.
POSSIBILITY OF CONSTRUCTION ON THE UPPER FLOOR OF TWO OR FOUR FLOORS.