2-room flat Calle Comunera María Pacheco, Los Pacos, Fuengirola
FuengirolaCalle Comunera María Pacheco
€ 349,950
2 rooms
117 m²
2 bathrooms
Floor G
Lift
Terrace
Only Kitchen Furnished
Note
add
Listing updated on 11/28/2024
Description
This description has been translated automatically by Google Translate and may not be accurate
reference: ONTI2-FUENROS2D-20241128
NEW PROMOTION SUNSET VIEWS, FUENGIROLA- LOS PACOS
The new SUNSET VIEWS development is located in the northern area of Fuengirola, in the Barrio Los Pacos, a residential area, close to the beach and perfectly connected by road and public transport.
It consists of two buildings with 74 homes, which include two parking spaces, a storage room, two swimming pools and an outdoor workout space, designed for people with good taste who care about their well-being and that of their family. Ideal for disconnecting and enjoying the hours of sunshine a year and the fantastic sunsets that the Costa del Sol offers us.
Thermal comfort is one of the keys to enjoying a home, which is why the study of sunlight has been taken into account to take advantage of sunlight, minimising the impact of the midday sun. High-quality exterior carpentry, the high degree of thermal insulation of the building envelope, together with the controlled air renewal system, allows for cooler homes in summer and warmer in winter, reducing the need to use the latest generation air conditioning installed in all homes. Thanks to the materials, design and renewable energy generation elements, the energy rating is A, which means great savings and a considerable reduction in environmental impact.
*All the homes in the project have 2 parking spaces and 1 storage room included in the price.
English:Price: 2-bedroom homes (Phase I and Phase II) from 349,950+VAT (10%) 3-bedroom homes (Phase II only) from 419,950+VAT (10%)
Payment method: Residents Reservation: 16,500 Sale contract: 15% - reservation During the work: 15% (in 20 monthly payments) Handover of keys: 70%
Non-residents Reservation: 16,500 Sale contract: 20% - reservation During the work: 20% (in 2 payments) Handover of keys: 60%
PHASE I Delivery July 2026 and PHASE II - Delivery July 2027.